Project Title:
Replacement of Existing Wooden Poles – 115 kV Overhead Transmission Line
(OHTL) between SHEDGUM-2 BSP, HIE 1, UYUN, and JAWATHA BSP Substations
Client: Saudi Electricity Company
Contract Type: Lump Sum Turnkey (LSTK)
Overview:
This project involves the replacement of existing wooden pole overhead transmission lines with new steel structures and underground cable installations to enhance reliability and future scalability of the 115 kV transmission network. The main objective is to establish a robust 115 kV electrical link between UYUN and NADA substations using underground cables while upgrading and replacing the existing overhead lines between major substations in the network. The work shall include all necessary material procurement, civil works, installation, testing, and commissioning until full integration into the National Grid.
Key Components of Scope:
1. 115 kV Underground Cable (UG Cable) Portion:
- Installation
of new 115 kV UG cables between substations.
- Disconnection
of existing 115 kV UG cable links for future use.
2. 115 kV Overhead Transmission Line (OHTL) Portion:
- Installation
of new 115 kV OHTL using steel structures.
- Conversion
of existing wooden pole lines to steel towers.
- Dismantling
of old wooden pole OHTL infrastructure.
Involved Substations and Transition Areas:
# |
From
Substation |
To
Substation / Area |
Description |
1 |
UYUN 115/13.8
kV |
NADA 115/13.8
kV |
New UG Cable
Installation |
2 |
UYUN 115/13.8
kV |
Transition
Area near NADA |
New UG Cable
Installation |
3 |
UYUN 115/13.8
kV |
HIE-2
115/13.8 kV |
Disconnect UG
Cables for Future Use |
4 |
HIE-1
115/13.8 kV |
SHEDGUM-2
115/13.8 kV |
New OHTL
Installation |
5 |
HIE-2
115/13.8 kV |
SHEDGUM-2
115/13.8 kV |
New OHTL
Installation |
6 |
HIE-1
115/13.8 kV |
SHEDGUM-2
115/13.8 kV |
Disconnect
& Dismantle Wooden Pole OHTL |
7 |
UYUN 115/13.8
kV |
Transition
Area near NADA |
Disconnect
& Dismantle Wooden Pole OHTL |
0 Comments